Case Study

EC&I – Encapsulated Plant Store 3

Supply and installation of electrical panels, control and instrumentation, containment and cabling. Completed to globally recognised nuclear standards, the equipment and ancillary items were installed and commissioned successfully, and without any Lost Time Accidents. Utilising the close professional relationship built with Sellafield and other contractors

Evaporator D

£47m PROJECT VALUE 922,000 CE&I HOURS WORKED 240km CABLING INSTALLED At the time of construction, Evaporator D was the largest nuclear decommissioning project in the UK. It was designed to continue reduction of the volume of highly active legacy waste. Evaporator Delta was a new

Electrical Overlay Project

£2.3m PROJECT VALUE 24 MONTH DURATION 8 PEAK MANPOWER Due to the age and unsustainable condition of existing equipment within the building on site a new LV distribution needed to be installed. The new switchroom would be situated outside of the building to enable the