Electrical Overlay Project
£2.3m PROJECT VALUE 24 MONTH DURATION 8 PEAK MANPOWER Due to the age and unsustainable condition of existing equipment within the building on site a new LV distribution needed to be installed. The new switchroom would be situated outside of the building to enable the