Electrical Overlay Project

£2.3m PROJECT VALUE 24 MONTH DURATION 8 PEAK MANPOWER Due to the age and unsustainable condition of existing equipment within the building on site a new LV distribution needed to be installed. The new switchroom would be situated outside of the building to enable the

Evaporator D

£47m PROJECT VALUE 922,000 CE&I HOURS WORKED 240km CABLING INSTALLED At the time of construction, Evaporator D was the largest nuclear decommissioning project in the UK. It was designed to continue reduction of the volume of highly active legacy waste. Evaporator Delta was a new